We recently implemented phase 1 of Windchill PSM. During data migration WTParts were left without links to CAD Documents. Currently to create the links one must check out the WTPart, thus advancing the revsion of the WTPart, thus necessitating a drawing revision. Is there a way to circumvent the drawing revision? A thought was to manually change the LCS of the WTPart to "In Revision", but I am unaware of consequences that may occur. Thanks
↧