I want to explore change solutions in ProjectLink for the increased collaboration tools as part of our change process. However, I've not found a viable solution for copying the PDMLink objects into a Project for editing. The copy/paste option creates shared objects where all updates are shown in PDMLink. Save As and Move functions do not allow the objects to be transferred to ProjectLink. Is there a method for creating a copy of PDMLink objects in ProjectLink for editing? Is there another method for developing proposed solutions to changes before revising the objects as part of the ECN process?
Chris