Greetings Gurus,
Scenario: Engineer creates a structure (CAD or Product) including Part A in the assembly. Later the Engineer changes the BOM to replace Part A with Part B in the structure. I need to be able to record the event that Part A superseded Part B, capture it in an attribute "Superseded By" and send it to ERP.
Is anyone out there doing something like this? Does Windchill even track anything like this?
Comments appreciated.
Thanks in advance.
Cam