Quantcast
Channel: PTC Community : Unanswered Discussions - Windchill
Viewing all articles
Browse latest Browse all 3592

Regarding WTpart structuring from CAD models.....how to handle cut to length items?

$
0
0

In our case, we have cut to length items such as fuel hoses, plastic tubing, foam strips, edge guards, etc that are bought in bulk, then they are cut to length on the assembly line. 


Today we create manual WTpart BOM's because we have not associated our CAD models to the WTparts yet, but getting ready to .

I am trying to figure on how to handle the cut to length components.  Our WTpart default unit is in inches per below which is carried over into our ERP (Oracle).

 

Capture.JPG

 

So I associate the CAD model to the WTpart, I am thinking it will be "image" association because the CAD model will be configured at a different routing each time.  The BOM quantity will show up as 1 instead of the required quantity (such as 30, for 30 inches of tubing).   How do I get it to show up as 30 ?

 

Any suggestions would be great


Viewing all articles
Browse latest Browse all 3592

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>