Hello,
the FIDES 2009 standard not only mentiones but even emphasizes that different application factors should be connected with different mission phases.
In WQS unfortunately there is no way to do so. This is really a flaw because it is virtually natural that application factors vary with mission phases. Instead, WQS allows application factors only be connected with parts and assemblies.
Thomas Reiter