How can we ensure that documents “SHARED” to a project from PDMLink , does not get updated when the document undergoes a change in the PDMLink.
I would update the dcoument share in PJL manually when needed.
I cannot use PDM Check-out since I don’t want the supplier to modify the content or check-out the data. Also PDMCheckout results in the part being locked out in PDMLink since it is actually "checked out" !